CROSS-FUNCTIONAL PLANNINGAvailable

Every Planning Function in One Module

Tessaract XPM

Planning gets siloed. The PMO plans the portfolio, operations plans resources, the plant plans production, and finance owns the rates, each in a different tool that never reconciles. Tessaract XPM puts the whole planning picture in one place. Portfolio, resource, supply chain, and manufacturing planning share one data model and one set of WBS structures, and the numbers reconcile against live SAP actuals instead of a stack of spreadsheets.

POWERED BY EMBEDDED PARTNERSHIPS

SAP S/4HANA

Live cost, actuals, and Project System integration

Dassian

Results analysis and project cost planning

THE PROBLEM

Why Planning Stays Siloed

Portfolio, resource, and production planning live in different tools

The PMO, operations, and the plant each plan in isolation. Aligning the portfolio with resource capacity and production requires manual reconciliation that is stale by the time it is done.

Complex programs cannot be modeled in one WBS

A single work breakdown structure does not fit programs that need parallel cost, contract, and reporting breakdowns. Teams maintain separate structures that drift apart.

Plans do not reconcile with the ERP

Planning happens in spreadsheets while actuals live in SAP. Variance analysis becomes an exercise in matching two sources that were never designed to agree.

Rates and burdens are opaque and hard to defend

Labor rates, indirect pools, and burden waterfalls are buried in finance workbooks. When an auditor asks how a rate was built, the answer takes days to assemble.

ONE MODULE, EVERY FUNCTION

Planning That Reconciles Across the Enterprise

The same WBS structures and cost data flow through every planning function, so plans agree with each other and with the ERP.

01

Portfolio & Programs

Manage the portfolio with cost, schedule, and risk, and run complex programs with multi-WBS structures for parallel cost, contract, and reporting breakdowns.

02

Resource & Capacity

Plan resources across programs and departments with capacity and demand forecasting, and persist plan lines and periods as the plan evolves.

03

Rates & Burden

Build labor rates and a versioned burden engine with a CAS and DCAA compliant waterfall from ACDOCA through pools to segments.

04

Time & Labor

Capture time against a CATS-based timesheet and route it through a configurable approval methodology with approvers and delegates.

05

Supply Chain & Manufacturing

Align supply chain and manufacturing planning to the same program timelines so material and production plans move with the schedule.

06

SAP-Linked Actuals

Read live WBS actuals from ACDOCA, manage project currency rates directly against SAP, and push plan data to SAP results analysis and Dassian.

WHAT WE HAVE BUILT

Capabilities in the Solution

Project & Portfolio Management

Cost, schedule, and risk across the portfolio with multi-WBS support.

  • Portfolio management with cost, schedule, and risk in one view
  • Multi-WBS management for parallel work breakdown structures
  • Draft projects and a project wizard for fast setup
  • Predictive analytics and AI-generated reporting

Resource & Capacity Planning

Cross-functional resource planning with capacity and demand forecasting.

  • Resource planning across programs and departments
  • Capacity and demand forecasting
  • Autosaved resource plan lines and periods
  • PMAR planning grid by value category and month

Rates & Burden Engine

CAS and DCAA compliant rate and burden management.

  • Labor rates with a versioned burden engine
  • CAS and DCAA rate waterfall from ACDOCA to pool to segment
  • Rate assignments across programs and org units
  • Defensible, audit-ready rate derivation

Time, Labor & Delivery

Time capture, approval routing, and implementation delivery.

  • CATS-based timesheet with OData integration to S/4HANA
  • Approval methodology with approvers and delegates
  • Charge-object connectors for WBS and production orders
  • Six-phase S/4HANA implementation delivery module

SAP Integration

A planning front office wired to SAP as the system of record.

  • Live WBS actuals over ACDOCA
  • Project currency rates managed directly against SAP
  • Push plan data to SAP results analysis and Dassian
  • Purchase requisition and charge posting to SAP
FREQUENTLY ASKED QUESTIONS

Common Questions

What is Tessaract XPM?
Tessaract XPM is a cross-functional planning module that unifies project portfolio management, resource planning, supply chain planning, manufacturing planning, and program planning in one tool, with multi-WBS management and direct SAP S/4HANA integration.
What does multi-WBS management do?
Multi-WBS management lets a single complex program maintain parallel work breakdown structures in one environment, so cost, contract, and reporting breakdowns stay connected instead of living in separate tools.
Does it support CAS and DCAA compliant rates?
Yes. The rates engine builds labor rates and a versioned burden waterfall from ACDOCA through indirect pools to segments, producing defensible, audit-ready rates for CAS and DCAA environments.
How does it integrate with SAP?
Tessaract XPM reads live WBS actuals from ACDOCA, manages project currency rates directly against SAP, captures time through a CATS-based timesheet, and pushes plan data to SAP results analysis and Dassian.
Is it available today?
Yes. Tessaract XPM is available and in active use. You can create a free account to explore portfolio, resource, rates, and time management.
AVAILABLE

See It in Your Environment

Tessaract XPM is available today and in active use. Portfolio, resource, rates, and time management are live, with SAP-integrated actuals and currency. Create a free account to explore it.